Home FarmhousesDefence View Farms (DVF)Golf Residencia FarmsChaudhary FarmsIVY FarmsTheater FarmsCountry HomesApartmentsAskari 10 โ€” Tower 3Askari 10 โ€” Tower 5Askari HeightsDHACommercialOne Central โ€” Mughal BazarOne Central DHA โ€” PlotsIndustrialIndustrial ValleyHousing ProjectsBedian Modern VillageRoyal Residencia๐Ÿ˜ DHA Plots โ€” Phase & Block Wise๐Ÿ  DHA Houses โ€” Prices By Phase๐Ÿ“Š DHA File Rates โ€” Phase Wise๐Ÿงฑ Build Your House โ€” Cost, Rules & Elevations๐Ÿงพ DHA Transfer Charges Calculator๐Ÿ—บ DHA Maps โ€” Download All PhasesGallery Overseas Pakistanis Gallery ๐Ÿ’ฌ WhatsApp Us
Home / DHA / Build / Cost

What It Costs To Build A House In DHA Lahore

Real construction rates for 16 August 2026, by plot size and quality. Every figure is per square foot of covered area โ€” never plot area.

The mistake that costs people lakhs. A 1 kanal plot is 4,500 sq ft of land, but a double-storey house on it is around 6,000 sq ft of covered area. If someone quotes you a per-square-foot rate against the plot size, the real bill will land roughly 40% higher than you were told. Always ask which area the rate is against.
Estimated turnkey cost
โ€”
Covered area, typical double storeyโ€”
Grey structureโ€”
Finishingโ€”
Rate per sq ft coveredโ€”

Get a real quote on WhatsApp
Where these numbers come from. Eight Lahore builders and Zameen's own calculator, compiled 16 August 2026. Note that Zameen's calculator returns roughly 4,500โ€“4,700 per sq ft turnkey while Lahore builders quote 6,500โ€“8,500 for the same house. Both are honest โ€” Zameen prices materials and site labour at basic specification, builders add margin, design, supervision, wastage and DHA-grade finishing. We publish the builder figure because that is what you will actually be asked to pay.

What the material rates are doing

MaterialRateMovement
Cement โ€” 50 kg bagPKR 1,400 โ€“ 1,610up 8โ€“10% since early 2026
Steel / sariaPKR 255 โ€“ 265 per kgup 12โ€“15%; jumped in July, now flat
Bricks โ€” A-grade (awwal)PKR 17,000 โ€“ 22,000 per 1,000steady
Sand โ€” Chenab (concrete)PKR 55 โ€“ 75 per cftvaries by pit and haulage
Crush / bajriPKR 75 โ€“ 100 per cftvaries by source
Skilled labour (mason)PKR 2,500 โ€“ 3,500 per dayPunjab notified 2,000 in July
Cement is up 8โ€“10% and steel 12โ€“15% since early 2026. Steel jumped 10,000โ€“15,000 per ton in July and has since flattened. These move around 10% a quarter โ€” we refresh this page quarterly, same as the file rates.

Grey structure โ€” what you get and what you don't

Included in grey

  • Excavation and foundation
  • Masonry and RCC โ€” slabs, beams, columns
  • Staircase to plaster level
  • Internal and external plaster
  • Underground sewerage
  • PPRC water piping
  • Electrical conduiting
  • Roof waterproofing
  • Window grills
  • Boundary wall with gate columns

Not included โ€” this is what finishing buys

  • Flooring and tiles
  • Paint and wall finishes
  • Ceilings and false ceilings
  • Doors and windows
  • Sanitary and electrical fixtures
  • Lighting
  • Kitchen and wardrobe cabinetry
  • Exterior cladding and elevation finish
  • Landscaping
Basements cost about a third more per square foot โ€” PKR 4,000โ€“4,600 against 2,900โ€“3,300 above ground. That premium applies to the basement's own area. On a difficult water table, dewatering and retaining walls can push it further โ€” get the soil test done before anyone quotes you.